Counting garments through every wash

Between washing, drying, pressing, trimming and packing, pieces go missing and every stage counts by hand. A washable tag counted in and out of each stage shows where.

13 Nov 2026 · 2 min read · Zorsan

Garment processing area in a factory

In denim and garment processing, pieces go missing between stages: washing, hydro extraction, drying, pressing, thread trimming, quality checks, labelling, finishing and packing.

Every stage counts by hand. When the order reaches packing short, nobody can say where the pieces went.

Why the count breaks here

Processing is hard on any record. Paper tickets get wet. Barcode labels fade or tear in the wash. Garments are handled in large lots, moved on trolleys and in bags, and often sent to outside washing units and back. Each stage has every reason to count quickly and move on.

So shortages are found where it is too late to act: at packing, against the buyer's order, with the shipment date approaching. Re-cutting and re-sewing cost far more than the lost pieces themselves.

Washing and finishing

1,200 pieces in. 1,188 out.

Stage-by-stage counts show where the pieces were lost, the same day.

  1. 1,200Wash
  2. 1,200Hydro
  3. −121,188Drying
  4. 1,188Pressing
  5. 1,188Trimming
  6. 1,188Quality check
  7. 1,188Packing

A tag that survives the wash

Some factories now attach a washable tag to each garment at the end of sewing, inside its polybag or on a care label. The tag is designed to survive washing, drying and pressing.

At each stage, the lot passes a reading point at the entry and exit. Every piece is counted in and out automatically, in seconds, without opening bags or counting by hand. At trims and labelling, the tag is removed and replaced by the buyer's own hangtag, and the washable tag goes back to the start of the line to be used again.

What changes

A simple illustration

1,200 pieces go into the wash. 1,188 come out of pressing. With stage-by-stage counts, the record shows the 12 were lost at drying, not "somewhere in processing". The supervisor knows where to look while the lot is still on the floor.

The question for production heads

At which stage do your shortages usually start, and how many days pass before you find out?

Newsletter

Lessons from the floor, once a month.

One short read on where operations lose control and what it costs. No sales emails.

Next step

Is this happening in your operation?

Tell us where the record stops matching reality. We will look at the handover, what it costs and what would change.