← All articles

Deciding and planning

Start with one handover

You do not fix the whole chain at once. You fix the handover you trust least, measure the result, and extend from there.

13 Nov 2026 · 2 min read · Zorsan

Inspection point in an operation

When an operation decides to improve visibility, the temptation is to plan everything at once: every site, every process, every system. Large plans take a long time to approve, longer to deliver, and are hard to measure.

The operations that succeed usually start smaller.

Pick the handover you trust least

Every operation has one handover where people already know things go wrong: the store door, the packing table, the transfer between sites, the step between washing and finishing. Start there.

A good first handover has three properties:

  1. The cost is real and roughly known. Penalties, re-deliveries, write-offs or lost sales you can put a number on.
  2. It is contained. One dock, one store, one line, with a clear before and after.
  3. The result can be connected to the system people already use, so the change is felt, not just reported.

Agree the measures

Put a number on one handover.

Change the values to match the handover you trust least. The starting values are hypothetical.

Return in the first year54%
Over three years361%
Errors a month
50 → 5
Cost of errors a month
$12,500 → $1,250
Reduction in the cost of errors
90%
Net saving a month
$10,250
Payback
7.8 months

Hypothetical figures for illustration. Accuracy at the verification stage can reach up to 99%; your result depends on your operation.

Agree the measures before you start

Decide what will count as success, and measure it before anything changes. Four measures cover most cases:

Run it for a few weeks, then decide

A few weeks of real operation, including at least one busy period, is usually enough to see whether the numbers move. If they do, the case for extending to more sites or processes is built on your own data, not on a brochure.

Why this works

The question

If you could fix only one handover next quarter, which would it be?

Newsletter

Lessons from the floor, once a month.

One short read on where operations lose control and what it costs. No sales emails.

Next step

Is this happening in your operation?

Tell us where the record stops matching reality. We will look at the handover, what it costs and what would change.